中文字幕91,中文一区二区,亚洲无码视频网站,破解版黄色软件

  • <big id="9yq49"><nobr id="9yq49"></nobr></big>
    <pre id="9yq49"><nobr id="9yq49"></nobr></pre>
      江苏舜大新能源新资源有限公司
      Company news

         Company news

         Industry information

      Contact us

      Jiangsu Sunda New Energy Co., Ltd.
      EMAIL:sunda@jssunda.cn
      Add.:21st Floor, South Building, Zhigu Building, Yangzijiang Middle Road, Hanjiang District, Yangzhou City, Jiangsu Province

      Company news

      Tender notice

      2021-01-29 10:20:35

       

      Bidding notice

       

      Numbering:20210129-1

       

         
          
      Currently, our company is located in Liubao Town, Baoying County, Yangzhou City, Jiangsu Province. Part of the installation project and sporadic renovation project of the photovoltaic field needs to be tendered. This announcement is hereby announced.

       
          Engineering Content:
       
          1. Weeding work on 1,000 acres in the photovoltaic zone, including all weeds and shrubs in the site, all tool purchase fees, personnel wages, insurance, management fees, overtime, profits, personal accidental injuries, third-party damage compensation, etc. All costs should be included in the total contract price, which is a fixed total price.
       
          2. Exterior wall renovation project, exterior wall hanging net, three-layer putty, two-layer paint, the whitewashed surface is required to be white, light, without scars and no grooves. The contract price for this project is a fixed total price.
       
          3. For the installation project of the bridge cover in the photovoltaic area, the bidder shall quote the project based on the number of the missing part of the bridge cover on the site. The contract price shall include all costs such as cover purchase, transportation, installation, after-sales warranty, water fee, etc., the contract price It is a fixed total price.
       
          4. Safety sign production and installation project, the content of the project includes all work such as the customization, hanging, and installation of sign plates. Please refer to EXCEL attachment for the list of safety signs and customization requirements. The project price is a fixed total price.
       
       
       
          Bidding instructions:
       
          1. Bidders need to have the necessary qualifications for related projects. Individual bids are not accepted in this bidding. Bidders need to go to the project site to conduct surveys, and must count the workload, the quantity of materials purchased, etc., and the bid price must cover all the project content, and there must be no omissions.
       
          2. Safety and civilized requirements: Strictly implement the "Safety Production Law of the People's Republic of China", the "Regulations on the Safety Production Management of Construction Projects" (Order No. 393 of the State Council) and other relevant laws and regulations, the local safety production regulations of Jiangsu Province and Yangzhou City, and the "Safety Construction Agreement" (if any). There must be a special safety construction plan in the bidding document, which reflects measures to ensure the safety of high-altitude operations; the contractor obeys the unified management of the on-site general contractor and is responsible for implementing the safety measures and safety management of the contracted project. If safety measures and safety management are not in place and safety accidents occur, the responsibilities and losses incurred shall be borne by the contractor and have nothing to do with the developer.
       
          3. Before ordering all materials and equipment, samples must be submitted to Party A for on-site review, and the order can be ordered after review and approval. The construction plan in the bidding document must reflect the construction cooperation content with other professions, and the construction should be organized rationally to ensure the quality, duration and safety of the construction .
       
          4. Subcontracting and illegal subcontracting are not allowed in this project.
       
          5. The construction process of this project should strictly abide by the national and local epidemic prevention regulations for new coronary pneumonia.
       
       
       
          Engineering Quotation:
       
          After the bidder conducts the site survey, please conduct project accounting as soon as possible, and send the project quotation and related contracts to our company’s e-mail box in the form of e-mail.
       
       
       
      Site Contact: Zhou Wenfa
       
      Contact number: 13505271529
       
      E-mail: sundacg@jssunda.cn

      附件
       

      Director Zhao Yunfeng of the Energy Bureau of the Municipal Development and Reform Commission visited our company for inspection and guidance

      Good start!

      Engineering case

      Contact us

      About us

      WeChat public account

      Home     |     Latest News     |     Service items     |     Contact us    |

      Copyright © 2016 js sunda co.,ltd. All Rights Reserved Technical support: Jiangsu Ruizhijie Technology Co., Ltd.

    1. <big id="9yq49"><nobr id="9yq49"></nobr></big>
      <pre id="9yq49"><nobr id="9yq49"></nobr></pre>

        中文字幕91,中文一区二区,亚洲无码视频网站,破解版黄色软件

        品牌简介

        {转码主词}